Duke Energy request 897387
Duke Energy queue ID 897387
Queue request 897387 was listed in the Duke Energy interconnection queue at the end of 2025 as a 2 MW hydro project in Macon County, NC, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Active”.
| Queue ID | 897387 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Not reported |
| Point of interconnection | Not reported |
| County | Macon |
| State | NC |
| Voltage | Not reported |
| Capacity | 2 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Macon, NC: 1 request in the Duke Energy queue, 1 active totaling 2 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2023 DISIS |
| Interconnection service | Other |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Construction - In Progress |
| Queue date | 2023-06-28 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.