Substation Scout

Duke Energy request 568892

Duke Energy queue ID 568892

Queue request 568892 was listed in the Duke Energy interconnection queue at the end of 2025 as a 76 MW solar project in Darlington County, SC, according to Berkeley Lab’s queue data file. The filing names Darlington County Plant Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2027.

Queue ID568892
Project nameNot reported
Status (as published)Active
SubstationDarlington County Plant Substation
Point of interconnectionDarlington County Plant Substation
CountyDarlington
StateSC
VoltageNot reported
Capacity76 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Darlington, SC: 40 requests in the Duke Energy queue, 21 active totaling 1,211.4 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC
Cluster2022 DISIS
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - Pending
Queue date2022-06-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first