Duke Energy request 563202

Duke Energy queue ID 563202

Queue request 563202 was listed in the Duke Energy interconnection queue at the end of 2025 as a 2.7 MW battery project in Burke County, NC, according to Berkeley Lab’s queue data file. The filing names Nebo Ret as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 27, 2026.

Queue ID563202
Project nameNot reported
Status (as published)Active
SubstationNebo Ret
Point of interconnectionNebo Ret
CountyBurke
StateNC
VoltageNot reported
Capacity2.7 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-03-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Nebo Ret substation: 2 requests in the Duke Energy queue, 1 active totaling 2.7 MW.

Queue IDProjectMWResourceStatus
162458Not reported4BatteryWithdrawn

Burke, NC: 2 requests in the Duke Energy queue, 1 active totaling 2.7 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2022 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Construction - Pending
Queue date2022-06-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.