Duke Energy request 323
Duke Energy queue ID 323
Queue request 323 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Jackson County, FL, according to Berkeley Lab’s queue data file. The filing names Waukeenah Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2027.
| Queue ID | 323 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Waukeenah Substation |
| Point of interconnection | Waukeenah Substation |
| County | Jackson |
| State | FL |
| Voltage | Not reported |
| Capacity | 74.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2027-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Jackson, FL: 1 request in the Duke Energy queue, 1 active totaling 74.9 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Florida |
|---|---|
| Developer | Duke Energy Florida, LLC |
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Queue date | 2023-02-13 |