Substation Scout

Duke Energy request 273

Duke Energy queue ID 273

Queue request 273 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Polk County, FL, according to Berkeley Lab’s queue data file. The filing names Tiger Bay Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2022.

Queue ID273
Project nameNot reported
Status (as published)Active
SubstationTiger Bay Substation
Point of interconnectionTiger Bay Substation
CountyPolk
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Tiger Bay Substation substation: 4 requests in the Duke Energy queue, 3 active totaling 124.9 MW.

Queue IDProjectMWResourceStatus
345Not reported40GasOperational
58Not reported10GasOperational
275Not reported74.9SolarWithdrawn

Polk, FL: 39 requests in the Duke Energy queue, 13 active totaling 3,703.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperFL Solar 10, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Queue date2019-12-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first