Duke Energy request 24

Duke Energy queue ID 24

Queue request 24 was listed in the Duke Energy interconnection queue at the end of 2025 as a 70 MW gas project in Polk County, FL, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of June 1, 2011.

Queue ID24
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyPolk
StateFL
VoltageNot reported
Capacity70 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2011-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Polk, FL: 39 requests in the Duke Energy queue, 13 active totaling 3,703.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperNorthernStar
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2005-06-07
Operational date2006-06-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.