Substation Scout

Duke Energy request 210

Duke Energy queue ID 210

Queue request 210 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Suwannee County, FL, according to Berkeley Lab’s queue data file. The filing names Hickory Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 3, 2023.

Queue ID210
Project nameNot reported
Status (as published)Operational
SubstationHickory Switching Station
Point of interconnectionHickory Switching Station
CountySuwannee
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-04-03
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Suwannee, FL: 37 requests in the Duke Energy queue, 10 active totaling 679.1 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2017-12-22
Operational date2023-04-03

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.