Substation Scout

Duke Energy request 17113

Duke Energy queue ID 17113

Queue request 17113 was listed in the Duke Energy interconnection queue at the end of 2025 as a 36 MW gas project, according to Berkeley Lab’s queue data file. The filing names Buck Tie as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue ID17113
Project nameNot reported
Status (as published)Operational
SubstationBuck Tie
Point of interconnectionBuck Tie
CountyNot reported
StateNot reported
VoltageNot reported
Capacity36 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

DeveloperDuke Energy Carolinas LLC
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Commercial Operation - Commercial Operation Date Declared
Queue date2013-06-14
Operational date2014-11-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.