Queue request 17112 was listed in the Duke Energy interconnection queue at the end of 2025 as a 36 MW gas project, according to Berkeley Lab’s queue data file. The filing names Dan River Steam Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue ID17112
Project nameNot reported
Status (as published)Operational
SubstationDan River Steam Station
Point of interconnectionDan River Steam Station
CountyNot reported
StateNot reported
VoltageNot reported
Capacity36 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

DeveloperDuke Energy Carolinas-0001674400
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Commercial Operation - Commercial Operation Date Declared
Queue date2013-06-14
Operational date2015-12-10

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first