Duke Energy request 16227
Duke Energy queue ID 16227
Queue request 16227 was listed in the Duke Energy interconnection queue at the end of 2025 as a 2 MW solar project in Darlington County, SC, according to Berkeley Lab’s queue data file. The filing names HARTSVILLE SEGARS MILL as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 15, 2023.
| Queue ID | 16227 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | HARTSVILLE SEGARS MILL |
| Point of interconnection | HARTSVILLE SEGARS MILL 230KV |
| County | Darlington |
| State | SC |
| Voltage | 230 kV |
| Capacity | 2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2023-12-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Darlington, SC: 40 requests in the Duke Energy queue, 21 active totaling 1,211.4 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Cluster | Transitional Cluster Study |
| Interconnection service | Other |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Commercial Operation - Power Generation in Progress |
| Queue date | 2017-08-03 |
| Operational date | 2023-12-04 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.