Substation Scout

Duke Energy request 126062

Duke Energy queue ID 126062

Queue request 126062 was listed in the Duke Energy interconnection queue at the end of 2025 as a 35 MW solar project in Alamance County, NC, according to Berkeley Lab’s queue data file. The filing names Melville; N/A as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 10, 2026.

Queue ID126062
Project nameNot reported
Status (as published)Active
SubstationMelville; N/A
Point of interconnectionMelville; N/A
CountyAlamance
StateNC
VoltageNot reported
Capacity35 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-10
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Alamance, NC: 2 requests in the Duke Energy queue, 1 active totaling 35 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
ClusterTransitional Cluster Study
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2020-03-09

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first