Duke Energy request 116552
Duke Energy queue ID 116552
Queue request 116552 was listed in the Duke Energy interconnection queue at the end of 2025 as a 50 MW gas project, according to Berkeley Lab’s queue data file. The filing names Riverview SW STA as its point of interconnection. Its status as of December 31, 2025 was “Operational”.
| Queue ID | 116552 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Riverview SW STA |
| Point of interconnection | Riverview SW STA |
| County | Not reported |
| State | Not reported |
| Voltage | Not reported |
| Capacity | 50 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Developer | Broad River Energy LLC |
|---|---|
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Commercial Operation - Commercial Operation Date Declared |
| Queue date | 2020-05-24 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.