Wilson, NC interconnection queue

3 active projects totaling 200 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

3active projects
200active MW
7total filed
Queue IDProjectkVMWResourceStatus
31964 Not reported 230 803 Gas Withdrawn
963468 Not reported 230 80 Solar Active
PP00035 Not reported n/r 80 Other Active
126008 Not reported n/r 75 Solar Withdrawn
921117 Not reported 230 75 Solar Withdrawn
918065 Not reported 230 70 Solar Withdrawn
4894 Not reported 115 40 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.