Williamsburg, SC interconnection queue

4 active projects totaling 87.8 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

4active projects
87.8active MW
6total filed
Queue IDProjectkVMWResourceStatus
179866 Not reported 230 150 Solar Withdrawn
925531 Not reported n/r 74.9 Solar Active
20094 Not reported 115 40 Solar Withdrawn
977121 Not reported 230 6 Solar Active
977876 Not reported 230 5 Solar Active
956497 Not reported 115 1.9 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.