Substation Scout

Wilkes, NC interconnection queue

1 active project totaling 120 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

1active projects
120active MW
4total filed
Queue IDProjectkVMWResourceStatus
899053 Not reported n/r 120 Battery Active
171806 Not reported 44 21 Solar Withdrawn
565970 Not reported n/r 20 Solar Withdrawn
114704 Not reported n/r 4.6 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.