Substation Scout

Volusia, FL interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
143 Not reported n/r 1,180 Gas Withdrawn
157 Not reported n/r 1,174 Gas Withdrawn
156 Not reported n/r 655 Gas Withdrawn
12 Not reported n/r 182 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first