Substation Scout

Vance, NC interconnection queue

1 active project totaling 3.6 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

1active projects
3.6active MW
3total filed
Queue IDProjectkVMWResourceStatus
962795 Not reported n/r 60 Solar Withdrawn
918573 Not reported n/r 55 Solar Withdrawn
889853 Not reported n/r 3.6 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.