Taylor, FL interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
94 Not reported n/r 1,268 Gas Withdrawn
95 Not reported n/r 1,204 Gas Withdrawn
31 Not reported n/r 850 Coal Withdrawn
238 Not reported n/r 74.5 Solar Withdrawn
114 Not reported n/r 17 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.