Substation Scout

Sumter, SC interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
15918 Not reported 230 100 Solar Withdrawn
39370 Not reported n/r 100 Solar Withdrawn
5224 Not reported 230 100 Solar Withdrawn
920655 Not reported n/r 75 Solar Withdrawn
911187 Not reported n/r 74.9 Solar Withdrawn
918717 Not reported 115 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first