Scotland, NC interconnection queue

3 active projects totaling 165 MW in the Duke Energy queue, plus 14 with terminal status (shown grayed).

3active projects
165active MW
17total filed
Queue IDProjectkVMWResourceStatus
171542 Not reported 230 80 Solar Withdrawn
568988 Not reported 230 80 Solar Withdrawn
569632 Not reported 230 80 Solar Active
570092 Not reported 230 80 Solar Withdrawn
897025 Not reported 230 80 Solar Withdrawn
897027 Not reported 230 80 Solar Withdrawn
917441 Not reported n/r 80 Solar Withdrawn
917443 Not reported 230 80 Solar Active
920637 Not reported 230 80 Solar Withdrawn
962939 Not reported n/r 80 Solar Withdrawn
977271 Not reported n/r 80 Solar Withdrawn
5691 Not reported 230 75 Solar Withdrawn
145458 Not reported 115 74 Solar Withdrawn
177122 Not reported n/r 69.9 Solar Withdrawn
18250 Not reported 230 60 Solar Withdrawn
19261 Not reported 230 6.2 Solar Withdrawn
977889 Not reported 230 5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.