Sampson, NC interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
956340 Not reported 230 110 Solar Withdrawn
18049 Not reported 230 80 Solar Withdrawn
18052 Not reported 230 80 Solar Withdrawn
957012 Not reported 230 60 Battery Withdrawn
897237 Not reported n/r 7.2 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.