Queue IDProjectkVMWResourceStatus
956294 Not reported 100 115 Battery Active
956180 Not reported 100 99 Battery Withdrawn
957437 Not reported 230 33 Gas Active
957447 Not reported 230 33 Gas Active
957509 Not reported 230 33 Gas Active
957510 Not reported 230 33 Gas Active
957511 Not reported 230 33 Gas Active
956974 Not reported 100 28 Gas Active
977888 Not reported n/r 5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.