4 active projects totaling 1,937 MW in the Duke Energy queue, plus 13 with terminal status (shown grayed).

4active projects
1,937active MW
17total filed
Queue IDProjectkVMWResourceStatus
958347 Not reported 500 1,455 Gas Active
113970 Not reported 500 1,350 Gas Withdrawn
33170 Not reported 500 1,350 Gas Withdrawn
43466 Not reported 230 1,350 Gas Withdrawn
43484 Not reported 230 1,350 Gas Withdrawn
43498 Not reported 500 1,350 Gas Withdrawn
43510 Not reported 500 1,350 Gas Withdrawn
72278 Not reported 230 1,350 Gas Withdrawn
33182 Not reported 500 602 Gas Withdrawn
899771 Not reported 230 313 Gas Active
893373 Not reported 230 150 Battery Withdrawn
569802 Not reported 230 120 Solar Withdrawn
958348 Not reported 230 89 Gas Active
23707 Not reported 230 80 Solar Withdrawn
568986 Not reported 230 80 Solar Active
892419 Not reported 230 20.5 Battery Withdrawn
23715 Not reported 230 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.