Substation Scout

Pender, NC interconnection queue

1 active project totaling 3.1 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

1active projects
3.1active MW
3total filed
Queue IDProjectkVMWResourceStatus
569030 Not reported 230 200 Solar Withdrawn
569246 Not reported 230 75 Solar Withdrawn
977422 Not reported 230 3.1 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.