Newberry, SC interconnection queue

2 active projects totaling 270.7 MW in the Duke Energy queue, plus 11 with terminal status (shown grayed).

2active projects
270.7active MW
13total filed
Queue IDProjectkVMWResourceStatus
957146 Not reported n/r 200 Solar Active
957261 Not reported n/r 100 Battery Withdrawn
22084 Not reported n/r 79.8 Solar Withdrawn
22142 Not reported n/r 79.8 Solar Withdrawn
917941 Not reported n/r 74.9 Solar Withdrawn
569164 Not reported 100 70.7 Solar Active
22082 Not reported n/r 52.1 Solar Withdrawn
569756 Not reported n/r 48 Solar Withdrawn
919083 Not reported n/r 48 Solar Withdrawn
962883 Not reported 100 48 Solar Withdrawn
920631 Not reported n/r 38.3 Solar Withdrawn
956712 Not reported 100 38.3 Solar Withdrawn
957076 Not reported 44 18 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.