Manatee, FL interconnection queue

1 active project totaling 74.5 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

1active projects
74.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
194 Not reported n/r 74.5 Solar Operational
287 Not reported 69 74.5 Solar Withdrawn
298 Not reported n/r 74.5 Solar Withdrawn
299 Not reported n/r 74.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.