Madison, FL interconnection queue

5 active projects totaling 374.5 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

5active projects
374.5active MW
9total filed
Queue IDProjectkVMWResourceStatus
219 Not reported n/r 74.9 Solar Withdrawn
220 Not reported n/r 74.9 Solar Withdrawn
288 Not reported n/r 74.9 Solar Operational
306 Not reported n/r 74.9 Solar Operational
344 Not reported n/r 74.9 Solar Active
FC100006 Not reported 115 74.9 Solar Active
FC100007 Not reported 115 74.9 Solar Active
217 Not reported n/r 74.5 Solar Withdrawn
203 Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.