Lenoir, NC interconnection queue

2 active projects totaling 140 MW in the Duke Energy queue, plus 8 with terminal status (shown grayed).

2active projects
140active MW
10total filed
Queue IDProjectkVMWResourceStatus
569644 Not reported 115 91.3 Solar Withdrawn
22128 Not reported 230 79.8 Solar Withdrawn
22134 Not reported 230 79.8 Solar Withdrawn
569236 Not reported 230 73.9 Solar Withdrawn
917625 Not reported 230 73.9 Solar Withdrawn
962965 Not reported n/r 70 Solar Active
PP00045 Not reported n/r 70 Other Active
21764 Not reported 115 8 Solar Withdrawn
21772 Not reported 115 8 Solar Withdrawn
901397 Not reported 115 1 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.