Lake, FL interconnection queue
0 active projects totaling 0 MW in the Duke Energy queue, plus 10 with terminal status (shown grayed).
0active projects
0active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 9 | Not reported | 230 | 662 | Gas | Withdrawn |
| 21 | Not reported | n/r | 597 | Gas | Withdrawn |
| 22 | Not reported | n/r | 597 | Gas | Withdrawn |
| 23 | Not reported | n/r | 597 | Gas | Withdrawn |
| 120 | Not reported | n/r | 110 | Other | Withdrawn |
| 113 | Not reported | 69 | 100 | Solar | Withdrawn |
| 192 | Not reported | n/r | 25 | Solar | Withdrawn |
| 188 | Not reported | n/r | 20 | Solar | Withdrawn |
| 122 | Not reported | n/r | 15.7 | Other | Withdrawn |
| 127 | Not reported | n/r | 11 | Other | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.