0 active projects totaling 0 MW in the Duke Energy queue, plus 10 with terminal status (shown grayed).

0active projects
0active MW
10total filed
Queue IDProjectkVMWResourceStatus
9 Not reported 230 662 Gas Withdrawn
21 Not reported n/r 597 Gas Withdrawn
22 Not reported n/r 597 Gas Withdrawn
23 Not reported n/r 597 Gas Withdrawn
120 Not reported n/r 110 Other Withdrawn
113 Not reported 69 100 Solar Withdrawn
192 Not reported n/r 25 Solar Withdrawn
188 Not reported n/r 20 Solar Withdrawn
122 Not reported n/r 15.7 Other Withdrawn
127 Not reported n/r 11 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.