1 active project totaling 49.9 MW in the Duke Energy queue, plus 8 with terminal status (shown grayed).

1active projects
49.9active MW
9total filed
Queue IDProjectkVMWResourceStatus
4895 Not reported 230 101 Wind Withdrawn
4896 Not reported 230 101 Wind Withdrawn
20479 Not reported 230 80 Solar Withdrawn
570034 Not reported 230 80 Solar Withdrawn
896799 Not reported 230 80 Solar Withdrawn
138316 Not reported 115 74 Solar Withdrawn
977831 Not reported 230 49.9 Solar Active
918003 Not reported n/r 45 Solar Withdrawn
962964 Not reported n/r 45 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.