0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
145468 Not reported 230 71.3 Solar Withdrawn
910409 Not reported 115 70 Solar Withdrawn
962566 Not reported 115 70 Solar Withdrawn
10245 Not reported 230 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.