Hamilton, FL interconnection queue

4 active projects totaling 299.6 MW in the Duke Energy queue, plus 21 with terminal status (shown grayed).

4active projects
299.6active MW
25total filed
Queue IDProjectkVMWResourceStatus
99 Not reported n/r 102.1 Solar Withdrawn
103 Not reported 115 100 Solar Withdrawn
138A Not reported n/r 74.9 Solar Withdrawn
144A Not reported n/r 74.9 Solar Operational
158 Not reported n/r 74.9 Solar Operational
159 Not reported n/r 74.9 Solar Withdrawn
194B Not reported n/r 74.9 Solar Withdrawn
329 Not reported n/r 74.9 Solar Withdrawn
331 Not reported n/r 74.9 Solar Withdrawn
332 Not reported n/r 74.9 Solar Withdrawn
338 Not reported n/r 74.9 Solar Suspended
FC100012 Not reported 115 74.9 Solar Active
FC100015 Not reported 115 74.9 Solar Withdrawn
FC100016 Not reported 115 74.9 Solar Withdrawn
166 Not reported n/r 74.5 Solar Withdrawn
167 Not reported n/r 74.5 Solar Withdrawn
252 Not reported n/r 74.5 Solar Withdrawn
265 Not reported n/r 74.5 Solar Withdrawn
245 Not reported n/r 74 Solar Withdrawn
202 Not reported n/r 73 Solar Withdrawn
247 Not reported n/r 64 Solar Withdrawn
221 Not reported n/r 60 Solar Withdrawn
222 Not reported n/r 60 Solar Withdrawn
168 Not reported n/r 40 Solar Withdrawn
159B Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first