Hamilton, FL interconnection queue
4 active projects totaling 299.6 MW in the Duke Energy queue, plus 21 with terminal status (shown grayed).
4active projects
299.6active MW
25total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 99 | Not reported | n/r | 102.1 | Solar | Withdrawn |
| 103 | Not reported | 115 | 100 | Solar | Withdrawn |
| 138A | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 144A | Not reported | n/r | 74.9 | Solar | Operational |
| 158 | Not reported | n/r | 74.9 | Solar | Operational |
| 159 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 194B | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 329 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 331 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 332 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 338 | Not reported | n/r | 74.9 | Solar | Suspended |
| FC100012 | Not reported | 115 | 74.9 | Solar | Active |
| FC100015 | Not reported | 115 | 74.9 | Solar | Withdrawn |
| FC100016 | Not reported | 115 | 74.9 | Solar | Withdrawn |
| 166 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 167 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 252 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 265 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 245 | Not reported | n/r | 74 | Solar | Withdrawn |
| 202 | Not reported | n/r | 73 | Solar | Withdrawn |
| 247 | Not reported | n/r | 64 | Solar | Withdrawn |
| 221 | Not reported | n/r | 60 | Solar | Withdrawn |
| 222 | Not reported | n/r | 60 | Solar | Withdrawn |
| 168 | Not reported | n/r | 40 | Solar | Withdrawn |
| 159B | Not reported | n/r | 30 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.