Substation Scout

Gulf, FL interconnection queue

1 active project totaling 74.9 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

1active projects
74.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
285 Not reported n/r 74.9 Solar Operational
101 Not reported n/r 70 Other Withdrawn
108 Not reported n/r 61.5 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first