Substation Scout

Greenwood, SC interconnection queue

6 active projects totaling 253 MW in the Duke Energy queue, plus 22 with terminal status (shown grayed).

6active projects
253active MW
28total filed
Queue IDProjectkVMWResourceStatus
568550 Not reported n/r 197 Battery Withdrawn
977315 Not reported 100 99 Battery Active
70688 Not reported 115 75 Solar Withdrawn
917547 Not reported n/r 75 Solar Withdrawn
224618 Not reported n/r 74.9 Solar Withdrawn
566468 Not reported 115 74.9 Solar Withdrawn
569242 Not reported 115 74.9 Solar Withdrawn
912861 Not reported n/r 74.9 Solar Withdrawn
914237 Not reported n/r 74.9 Solar Withdrawn
915737 Not reported n/r 74.9 Solar Withdrawn
919467 Not reported n/r 74.9 Solar Withdrawn
962624 Not reported 44 74.9 Solar Withdrawn
963168 Not reported 44 74.9 Solar Withdrawn
223706 Not reported 115 74.5 Solar Withdrawn
68440 Not reported n/r 74.3 Solar Withdrawn
572280 Not reported 100 72 Solar Active
62472 Not reported n/r 55 Solar Withdrawn
126066 Not reported n/r 34 Solar Active
62756 Not reported n/r 32 Solar Withdrawn
957449 Not reported n/r 26.1 Solar Active
918641 Not reported n/r 25 Solar Withdrawn
963123 Not reported 44 25 Solar Withdrawn
223990 Not reported 44 20 Solar Withdrawn
566014 Not reported 44 20 Solar Withdrawn
962978 Not reported n/r 20 Solar Withdrawn
977885 Not reported 44 19.9 Solar Active
19603 Not reported n/r 2 Solar Withdrawn
968499 Not reported n/r 2 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first