Gadsden, FL interconnection queue

2 active projects totaling 149 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

2active projects
149active MW
5total filed
Queue IDProjectkVMWResourceStatus
250 Not reported n/r 74.9 Solar Withdrawn
235 Not reported n/r 74.5 Solar Operational
236 Not reported n/r 74.5 Solar Active
251 Not reported n/r 74.5 Solar Withdrawn
317 Not reported n/r 74.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.