Dillon, SC interconnection queue

3 active projects totaling 78 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

3active projects
78active MW
7total filed
Queue IDProjectkVMWResourceStatus
915773 Not reported 230 65 Solar Active
PP00030 Not reported n/r 65 Other Withdrawn
4538 Not reported 115 10 Solar Withdrawn
956528 Not reported 230 9 Solar Active
968543 Not reported 230 4 Solar Active
19139 Not reported 115 2 Solar Withdrawn
4484 Not reported 115 2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.