Substation Scout

Craven, NC interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
20841 Not reported 230 80 Solar Withdrawn
20843 Not reported 230 80 Solar Withdrawn
569984 Not reported 230 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.