Clarendon, SC interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
8609 Not reported 230 80 Solar Withdrawn
8038 Not reported 230 75 Solar Withdrawn
957318 Not reported 230 74.9 Solar Withdrawn
900727 Not reported 115 58.5 Solar Withdrawn
917525 Not reported 230 35 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.