Chester, SC interconnection queue
2 active projects totaling 89.7 MW in the Duke Energy queue, plus 10 with terminal status (shown grayed).
2active projects
89.7active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 66052 | Not reported | 100 | 74.5 | Solar | Withdrawn |
| 48968 | Not reported | n/r | 69.8 | Solar | Active |
| 963467 | Not reported | 100 | 68 | Solar | Withdrawn |
| 920667 | Not reported | n/r | 64 | Solar | Withdrawn |
| 920197 | Not reported | n/r | 44 | Solar | Withdrawn |
| 962805 | Not reported | 100 | 44 | Solar | Withdrawn |
| 16298 | Not reported | n/r | 39 | Solar | Withdrawn |
| 918031 | Not reported | n/r | 30 | Solar | Withdrawn |
| 962985 | Not reported | n/r | 20 | Solar | Withdrawn |
| 977884 | Not reported | 100 | 19.9 | Solar | Active |
| 15376 | Not reported | n/r | 15 | Solar | Withdrawn |
| 957241 | Not reported | n/r | 6 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.