Substation Scout

Chatham, NC interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
899003 Not reported 230 350 Battery Withdrawn
41118 Not reported n/r 260 Gas Withdrawn
40614 Not reported n/r 223.5 Gas Withdrawn
41114 Not reported n/r 223.5 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.