Substation Scout

Carteret, NC interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
8603 Not reported 115 200 Wind Withdrawn
4907 Not reported 230 120 Wind Withdrawn
21923 Not reported 115 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first