Substation Scout

Brunswick, NC interconnection queue

3 active projects totaling 130 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

3active projects
130active MW
4total filed
Queue IDProjectkVMWResourceStatus
4903 Not reported n/r 104 Gas Operational
4867 Not reported 230 80 Solar Withdrawn
957249 Not reported 230 13 Nuclear Active
957251 Not reported 230 13 Nuclear Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first