Substation Scout

Anson, NC interconnection queue

3 active projects totaling 1,486.5 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

3active projects
1,486.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
977454 Not reported 230 990 Gas Active
41638 Not reported n/r 937 Nuclear Withdrawn
977444 Not reported 230 495 Gas Active
8286 Not reported 230 5 Solar Withdrawn
977636 Not reported n/r 1.5 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first