Paul Substation substation interconnection queue

1 active project totalling 300 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
G9 1100MW Paul 500 1,100 Gas WITHDRAWN
G1007 Not reported n/r 300 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.