Substation Scout

Midway Substation substation interconnection queue

2 active projects totalling 800 MW in the BPA queue.

2active projects
800active MW
2total filed
Queue IDProjectkVMWResourceStatus
G1037 Not reported n/r 400 Solar STUDY
G1038 Not reported n/r 400 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.