Substation Scout

Midway Substation at substation interconnection queue

2 active projects totalling 700 MW in the BPA queue.

2active projects
700active MW
2total filed
Queue IDProjectkVMWResourceStatus
G1039 Not reported 230 400 Solar STUDY
G1040 Not reported 230 300 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.