Longhorn Substation substation interconnection queue

1 active project totalling 0 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0636 Not reported 230 350 Solar WITHDRAWN
G0908 Not reported n/r 0 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.