Substation Scout

John Day-Marion No 1 line. substation interconnection queue

2 active projects totalling 0 MW in the BPA queue.

2active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0862 Not reported 500 0 Battery STUDY
G0863 Not reported 500 0 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.