Substation Scout

Columbia Substation @ substation interconnection queue

2 active projects totalling 150 MW in the BPA queue.

2active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0858 Not reported 230 130 Battery STUDY
G0829 Not reported 230 20 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.