tap of CHARMERP4A - South Lane City substation interconnection queue

2 active projects totalling 267.1 MW in the ERCOT queue.

2active projects
267.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
28INR0160 Neal Solar 138 146.6 Solar SS Completed, FIS Started, No IA
28INR0452 Neal Battery 138 120.5 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.